---
title: "Unsatisfactory EICR: what happens next? | 4.7 Star · NAPIT · From £60"
description: "Unsatisfactory EICR in Peterborough: Lighting Electrical reads each C1, C2 and further investigation item and writes a price for the remedial work."
canonical: "https://lightingelectrical.co.uk/problems/failed-eicr"
---

# Unsatisfactory EICR: what happens next?

> Unsatisfactory EICR in Peterborough: Lighting Electrical reads each C1, C2 and further investigation item and writes a price for the remedial work.

An unsatisfactory Electrical Installation Condition Report, an EICR, means remedial work is needed on items marked unsafe or still unconfirmed. Lighting Electrical in Peterborough reads the report and writes a price for the repairs.

## Why is an EICR unsatisfactory?

An EICR is unsatisfactory because it contains a C1, a C2, or further investigation. A C3 recommendation on its own leaves the report satisfactory.
- **A C1 means danger is present:** A C1 means danger is present on the named circuit, so that circuit needs remedial work now. If the breaker is already off, it stays off. We test the named circuit before any repair starts.
- **A C2 means it may become dangerous:** A C2 means the item is potentially dangerous, and that code still fails the report. Sockets with no RCD protection are recorded this way. An RCD is a switch that cuts the power when current leaks to earth.
- **Further investigation is still open:** Further investigation means the inspector could not confirm that part was safe. The report shows this as FI. The EICR stays unsatisfactory until that circuit or joint has been tested.
- **The consumer unit lacks modern protection:** Rewirable fuse wire does not act as an RCD or an RCBO. An RCBO protects one circuit against overload and against a leak to earth. A report that codes this board is priced as fuse board replacement.
- **Earthing or bonding is recorded as failed:** Earthing is the path that carries fault current back so a protective device can open. Bonding joins metal water and gas pipes to that path. A missing or broken link is coded because a fault may not clear.

## What can I check on an unsatisfactory EICR?

You can read the report and look at the outside of the fuse board. Keep every cover on, and keep your hands off cables and gas pipes.
- **The result on the front of the report:** The summary says satisfactory or unsatisfactory. Unsatisfactory means the observations include a C1, a C2 or further investigation. C3 notes with a satisfactory result are not a failed report.
- **What each observation code means:** Read the code beside each line. C1 is danger present. C2 is potentially dangerous. C3 is only a recommendation. FI means further investigation and that item still needs a test.
- **The time the report allows for repairs:** The observations state the time for the remedial work. For a private rented home in England the limit is 28 days, or fewer days when the report says so. Keep the report so those same lines can be tested.
- **The fuse board with the cover shut:** Look for fuse wire, brown marks, or a breaker that is already down. Leave the screws in place. Do not reset a circuit the report has given a C1.

## When should I book after an unsatisfactory EICR?

Book Now if the report is unsatisfactory, and book first when a C1 is listed. A satisfactory report that only lists C3 items does not need remedial work.
- **The report includes a C1:** Danger is present on the circuit named in that line. Leave the breaker off when it is already off. Book Now so we can test the failed part and price the repair.
- **A C2 or further investigation is listed:** Either code keeps the report unsatisfactory. Book Now and have the report with you. We test the named item and write a price before the repair starts.
- **The property is privately rented:** In England the C1, C2 and further investigation items are due within 28 days, or sooner when the report gives fewer days. Book Now with the report. We give you the certificate for the remedial work we finish.

## What happens on a visit for an unsatisfactory EICR?

We read your report, test each coded item, and write the remedial price before a repair starts.
- **We match the report to the installation:** We go through every C1, C2 and further investigation line with you. Each line is tied to a circuit or to the consumer unit. No cover comes off until that item is the one under test.
- **We test the circuits the report names:** We isolate the circuit named in the observation. Continuity shows whether the copper still joins end to end. Insulation shows whether current can leak between the conductors. The readings separate a cable, a joint, a device and the consumer unit.
- **We check earthing, bonding and the supply:** We check earthing, bonding and spare capacity on the supply before we write a price. Spare capacity means the supply can carry another load. The age of the house does not set the price on its own.
- **The repair and the certificate:** Work starts after you accept the written price. A failed consumer unit is fuse board replacement, with RCD or RCBO protection and notification through NAPIT. A repair to one existing circuit is recorded on a minor works certificate. A new EICR of the whole installation is its own job.

## What does work after an unsatisfactory EICR cost?

The price covers the time to read the unsatisfactory EICR, test each C1, C2 and further investigation item, and tell you what failed. Any repair starts only after you accept a written price. A longer test, a part, a consumer unit, or the certificate for that work changes the price.
- Consumer unit replacement: from £450
- A C3 item stays off the remedial price unless you ask for that improvement.
- Fuse board replacement has its own written price when the consumer unit is the failed part.
- We fit a Hager, Wylex, Contactum, BG Electrical or MK Electric unit only when the remedial work needs that new board or device.

## Questions about an unsatisfactory EICR

### Does a C3 make my EICR unsatisfactory?

No. A C3 is a recommendation for improvement, and it does not fail the report. The report is unsatisfactory when a C1, a C2 or further investigation is present. We price a C3 item on its own if you want that work done.

### Will you replace the fuse board?

We replace it when the observations show the consumer unit has failed or lacks the RCD or RCBO protection the circuits need. A board that tests sound stays in place. Fuse board replacement then has its own written price, and the certificate is notified through NAPIT.

### Do I get a new EICR after the repairs?

A minor works certificate records a repair to one existing circuit, and a new consumer unit gets an electrical installation certificate. A full EICR is a separate inspection of the whole installation. We do that inspection as its own job.

### What should a landlord pass to the tenant?

Give the tenant the unsatisfactory EICR, then written confirmation after the C1, C2 and further investigation items are finished. In England that work is due within 28 days, unless the report gives fewer days. We provide the certificate for the remedial work we complete.

### Does the whole house need to be off?

No. We isolate the circuit named in the observation we are testing. Circuits the report leaves in service stay on. A C1 circuit stays off until the failed part is repaired and that circuit is tested again.

## Related problems
- [Fuse box in the bathroom: is it legal?](https://lightingelectrical.co.uk/problems/fuse-box-in-bathroom): A consumer unit inside a bathroom is not permitted and has to be moved outside that room.
- [Old fuse box: do I need to upgrade?](https://lightingelectrical.co.uk/problems/old-fuse-box): An old fuse box needs an upgrade when it still uses fuse wire or has no residual current protection.
- [Signs your fuse box needs upgrading](https://lightingelectrical.co.uk/problems/fuse-box-needs-upgrading): A fuse box needs upgrading when it has fuse wire, no RCD, no spare ways, or a hot scorched cover.
- [Still got rewirable fuses?](https://lightingelectrical.co.uk/problems/rewirable-fuses): A rewirable fuse box relies on fuse wire and has no residual current device, so the board is replaced and every circuit is tested.
- [Aluminium wiring in the house](https://lightingelectrical.co.uk/problems/aluminium-wiring): Aluminium cable overheats at loose joints. We test it, write the electrical installation condition report, and price any copper replacement separately.
- [Automatic gate not opening](https://lightingelectrical.co.uk/problems/electric-gate-not-working): A gate that will not move has lost its supply, its safety beam or its motor control, so the outdoor circuit needs a test.

## Sources
- [BS 7671: IET Wiring Regulations (18th Edition)](https://electrical.theiet.org/bs-7671/)
- [HM Government: Approved Document P (Electrical Safety)](https://www.gov.uk/government/publications/electrical-safety-approved-document-p)
- [GOV.UK: Electrical safety standards in the private and social rented sectors](https://www.gov.uk/government/publications/electrical-safety-standards-in-the-private-and-social-rented-sectors-guidance/electrical-safety-standards-in-the-private-and-social-rented-sectors-guidance)

Updated 2026-11-16.

[Consumer unit replacement](https://lightingelectrical.co.uk/services/fuse-board-replacement)

## Book or ask a question
- [Book Now](https://lightingelectrical.co.uk/#chat)
