---
title: "Part P non compliance: what to do | 4.7 Star · NAPIT · From £60"
description: "Part P non compliance in Peterborough is unnotified or unsafe fixed wiring. Lighting Electrical inspects the circuits and issues a written EICR."
canonical: "https://lightingelectrical.co.uk/problems/part-p-non-compliance"
---

# Part P non compliance: what to do

> Part P non compliance in Peterborough is unnotified or unsafe fixed wiring. Lighting Electrical inspects the circuits and issues a written EICR.

Part P non compliance means notifiable wiring in a home was not notified or is unsafe. Lighting Electrical in Peterborough inspects the fixed wiring and issues a written EICR.

## Why does Part P non compliance happen?

Part P non compliance happens when notifiable electrical work in a home was not notified, or the wiring is unsafe under BS 7671. BS 7671 is the IET Wiring Regulations for fixed wiring.
- **A new circuit was not notified:** A new circuit is a cable from the consumer unit to new sockets, lights or a cooker. In a dwelling in England that work is notifiable under Part P. Without a notification there is no completion record for the circuit.
- **A consumer unit was replaced:** The consumer unit is the fuse board. Replacing it in a home is notifiable Part P work. A new board using Hager, Wylex, Contactum, BG Electrical or MK Electric breakers still needs notification and a certificate for that replacement.
- **Wiring in a bathroom or shower room:** A bathroom or a room with a shower is a special location under Part P. Adding or altering a circuit there is notifiable. An electric shower, an extractor fan or a new light in that room is often the work that lacked notification.
- **Missing earthing or bonding:** Earthing is the path that carries fault current so a breaker can open. Bonding is the link between metal pipes and the consumer unit. Altered wiring with no earth, or pipes left unbonded, does not meet BS 7671 and fails the safety duty in Part P.
- **New work on a board with no RCD:** An RCD is a safety switch that turns the power off when current leaks to earth. Circuits added in a home need that protection where BS 7671 requires it. New cables left on an old fuse only board are a Part P safety failure.

## What can I check safely before a visit?

You can check the papers, the closed fuse board and the rooms that were altered. Leave every cover screwed on and do not touch a cable.
- **Papers for earlier electrical work:** Look for an electrical installation certificate, a minor works certificate or a building control completion paper for a new consumer unit, a new circuit or bathroom wiring. Write down any job you know was done and has no paper with it.
- **The fuse board with the cover shut:** Read the circuit names on the front. Note old rewireable fuses, no RCD test button, or a board with no circuit list. Leave the cover screws in place and keep your hands off the cables.
- **Rooms where the wiring looks newer:** Note extra sockets, new downlights, an electric shower or an outside socket where the rest of the wiring looks older. Match each one to a certificate if you have it. Do not open a fitting or a shower.
- **Heat, marks or a burning smell:** Brown marks around socket pin holes, a warm faceplate or a smell of burning means stop using that point. Switch that circuit off with the breaker handle on the front of the closed fuse board.

## When should I book for Part P non compliance?

Book Now when a new board, a new circuit or bathroom wiring has no certificate, or when a breaker, socket or board is hot or smells of burning.
- **No certificate for notifiable work:** The consumer unit was replaced, a new circuit was added, or bathroom wiring was altered, and you have no certificate. Book Now and we inspect the fixed wiring and issue an EICR.
- **A landlord or buyer needs a report:** A letting agent or a buyer has asked for a current electrical report on the fixed wiring. We carry out the EICR and leave you the written report. Any repair is a separate price after that.
- **Heat, burning or a breaker that drops:** A burning smell, a hot socket or a breaker that opens straight away is a reason to stop using that circuit. Switch it off at the closed fuse board and Book Now.

## What happens on a Part P inspection visit?

We inspect and test the fixed wiring, then we write the EICR. A repair starts only after you accept a separate written price.
- **The work you already know about:** We ask which rooms changed, whether the consumer unit is new, and which certificates you hold. We read the fuse board with you while the cover stays on. We note any socket or fitting you want included in the test.
- **Tests with the power off, then on:** We isolate the supply and test each circuit. Earth continuity checks that the earth wire joins the whole circuit. Insulation resistance checks that the live conductors are not leaking. We then switch power back on to test each RCD.
- **The EICR and what each code means:** We record every observation as C1, C2, C3 or FI. C1 means danger is present, so we isolate that circuit before we leave. C2 means potentially dangerous and the report is unsatisfactory. C3 means improvement recommended and FI means further investigation.
- **Repairs you can book after the report:** We quote any repair in writing and the inspection price stays separate. If you accept a new consumer unit, a new circuit or bathroom wiring, we fit that work, test it and notify it through NAPIT. A smaller alteration receives a minor works certificate for the job we finished.

## What does a Part P inspection cost?

The price covers the inspection of the fixed wiring and the written EICR. More circuits, an outbuilding or a commercial board take longer and change the price. A repair, a replacement consumer unit and the certificate for that later job are priced after the report.
- EICR (electrical safety report): from £150
- Extra circuits, an outbuilding or a shop board add time and change the inspection price.
- Parts such as a Hager, Wylex, Contactum, BG Electrical or MK Electric breaker are added only when you accept a repair.
- A minor works certificate or an electrical installation certificate is priced with the repair it belongs to.

## Questions about Part P non compliance

### What is Part P?

Part P is the Building Regulations requirement for electrical safety in dwellings in England. A new circuit, a replacement consumer unit, and altered wiring in a bathroom or shower room are notifiable. All other fixed wiring work still has to meet BS 7671.

### What does the EICR show?

An EICR is an Electrical Installation Condition Report on the fixed wiring in the property. It lists the circuits, the tests and each finding as C1, C2, C3 or FI. You see what is unsafe and what we would quote as a repair.

### Do I need to be in the property?

Someone who can let us in has to stay while the power is off for the tests. A tenant can be present when the landlord has arranged the visit. We put each circuit back on as its tests finish.

### Can you put right what the report finds?

Yes. We quote the repair in writing and start it only after you accept that price. We test the finished work. Where that repair is notifiable we notify it through NAPIT and leave the certificate for the work we have just completed.

### What about a rented home?

A private rented home in England needs a current EICR, at five years or at a new tenancy if the last report has ended. We inspect the fixed wiring and issue the report for the tenancy file. Repairs shown on the report are a separate booking.

## Related problems
- [Aluminium wiring in the house](https://lightingelectrical.co.uk/problems/aluminium-wiring): Aluminium cable overheats at loose joints. We test it, write the electrical installation condition report, and price any copper replacement separately.
- [Buying a house with old electrics](https://lightingelectrical.co.uk/problems/buying-house-old-electrics): An EICR sets out the condition of old electrics before you buy, circuit by circuit.
- [House not up to electrical regulations](https://lightingelectrical.co.uk/problems/house-not-up-to-electrical-regs): An EICR names the parts of the fixed wiring that fall short of the current rules, and repairs are priced afterwards.
- [How to tell if a house needs rewiring](https://lightingelectrical.co.uk/problems/signs-house-needs-rewiring): The house needs rewiring when an EICR shows the cables or the fuse board cannot be made safe by repairing one circuit.
- [Is my metal fuse box safe?](https://lightingelectrical.co.uk/problems/metal-fuse-box): A metal cover does not make a fuse box safe. The devices, earthing and cables settle that, and an EICR records the result.
- [No electrical certificate for the property](https://lightingelectrical.co.uk/problems/no-electrical-certificate): An EICR of the fixed wiring replaces a missing electrical certificate and leaves you the written report.

## Sources
- [HM Government: Approved Document P (Electrical Safety)](https://www.gov.uk/government/publications/electrical-safety-approved-document-p)
- [Building Regulations Part P: Electrical Safety in Dwellings](https://www.legislation.gov.uk/uksi/2010/2214/contents/made)
- [BS 7671: IET Wiring Regulations (18th Edition)](https://electrical.theiet.org/bs-7671/)

Updated 2026-11-16.

[EICR](https://lightingelectrical.co.uk/services/eicr)

## Book or ask a question
- [Book Now](https://lightingelectrical.co.uk/#chat)
