---
title: "Told your supply is too small for a 7kW charger | 4.7 Star"
description: "7kW charger and a 60 amp main fuse in Peterborough: why installers say the supply is too small, what you can check safely and what the survey visit covers."
canonical: "https://lightingelectrical.co.uk/problems/supply-too-small-for-a-charge-point"
---

# Told your supply is too small for a 7kW charger

> 7kW charger and a 60 amp main fuse in Peterborough: why installers say the supply is too small, what you can check safely and what the survey visit covers.

A 60 amp main fuse does not rule out a 7kW charger. Lighting Electrical in Peterborough adds up what the house already draws, then sets the charger to suit what the supply can carry.

## Why am I told my supply is too small for a 7kW charger?

The service cutout, the sealed fuse box where the supply enters, caps what the whole house can draw. A charger adds a long, steady load on top of cooking, showers and heating.
- **A cutout rated at 60 amps:** The network operator owns the cutout. At 60 amps it leaves little room once a 32 amp charger is added to a normal evening in the house.
- **Electric cooking, shower and immersion heater:** These already take much of the current at the hours a car is usually plugged in. A charger on top can push the total past what the cutout carries.
- **A heat pump or second charger added since:** Equipment fitted after the supply was first sized uses up headroom. The survey counts it before any charger goes on the list.
- **Meter tails or a board too small:** Meter tails are the thick cables between the meter and the consumer unit. If they or the board cannot take another 32 amp circuit, they need uprating before a charger joins them.
- **One cutout feeding more than one home:** On a shared or looped service the capacity is split between homes. The load of everything on that cutout is counted, not one home's alone.

## What can I look at myself without opening anything?

Everything here is done from outside. The cutout stays sealed, every cover stays on and the meter tails stay untouched.
- **The number on the cutout:** The fuse carrier beside the meter is usually marked 60, 80 or 100. Read it from where you stand and note it down.
- **What runs on electricity:** Note whether cooking and hot water are electric or gas, and whether there is an electric shower, a heat pump or an existing charger.
- **Who runs your supply:** 105 is the free number that names the network operator for your street. Only that operator changes the cutout fuse or the cable feeding the house.
- **A photo of the closed board:** Take a picture of the consumer unit with its cover shut, plus the parking space and the wall you have in mind for the charger.

## When is it time to book a survey?

Book Now before the charger is ordered, because the survey decides which setup the supply allows and what it needs.
- **Someone has called the main fuse too small:** One rating does not settle it. The survey counts the real demand in the house against the cutout.
- **The consumer unit is full or older:** A charger needs its own protected circuit, so the board needs a spare way and suitable protection first.
- **The parking space is far from the meter:** A long cable run changes the work. The survey measures it so the length shows on the written quote.

## What happens at the survey visit?

The visit works out what the supply carries before a charger is chosen, so the written quote reflects the house as it stands.
- **The supply and board are looked at:** We read the cutout rating, check the meter tails and main switch, and look at the consumer unit and earthing for a new 32 amp circuit.
- **Demand is added up:** Cooking, hot water, heating and any heat pump are counted against the cutout. That shows whether the charger fits whole, fits with a sensor, or needs limiting.
- **Load control and output are set out:** Where headroom is tight, a sensor clamped round the incoming cable tells the charger to ease off when the house draws more. We set the top output to match.
- **The network operator is told:** A charger installation is notified to the network operator, and the work is notified through our NAPIT registration. A supply upgrade is the operator's job, and we explain what they ask for.

## What does the charger price cover and what changes it?

The price covers fitting a 7.4kW single phase charger on its own circuit, with the usual cable run, testing and the certificate. Anything the survey finds beyond that, such as board work or a longer run, appears as its own line on the written quote.
- EV charger installation (7.4kW): from £750
- A supply upgrade by the network operator is separate work and sits outside the installation price.
- A full or unsuitable consumer unit adds board work, priced on its own line before anything starts.
- Fitting a sensor for load control, or setting a lower output, changes what is installed, so the quote states which applies.

## EV charger installation near you
- [EV charger installation in Marks Tey](https://lightingelectrical.co.uk/electrician-marks-tey/ev-charger-installation)
- [EV charger installation in Maldon](https://lightingelectrical.co.uk/electrician-maldon/ev-charger-installation)
- [EV charger installation in Rowhedge](https://lightingelectrical.co.uk/electrician-rowhedge/ev-charger-installation)

## Questions about a 7kW charger on a small supply

### Can I have my main fuse upgraded?

Only the network operator can change it, and whether they can depends on the cable feeding the house as well as the fuse. 105 tells you who yours is. We explain what they ask for if an upgrade is the answer.

### What does load management do to my charging?

It eases the charger back when the rest of the house draws more and lets it rise again when the load falls. Most of a charge happens overnight while the house is quiet.

### Is a lower power charger worth having?

A 3.6kW unit charges at about half the speed, which over a night is still far more than a three pin socket gives. Where the supply cannot carry more, it is a proper answer, and many units can be raised later.

### Do I need to tell the network operator myself?

No. We notify the network operator about the charger, and the work is notified through our NAPIT registration. Both are part of the installation.

## Related problems
- [How far can an EV charger be from the consumer unit](https://lightingelectrical.co.uk/problems/charge-point-too-far-from-the-car): A distant parking space can take a charge point when a new cable is sized from the consumer unit to the bay.
- [Problems after EV charger installation](https://lightingelectrical.co.uk/problems/ev-charger-installation-issues): A trip, a refused start or a slow charge after fitting points to the charger circuit, the earth path or the house supply.
- [Two electric cars and one charge point](https://lightingelectrical.co.uk/problems/two-cars-one-charge-point): One charge point serves two cars by taking turns. Charging both together needs a second charger, or a twin unit, that shares the spare current.
- [Aluminium wiring in the house](https://lightingelectrical.co.uk/problems/aluminium-wiring): Aluminium cable overheats at loose joints. We test it, write the electrical installation condition report, and price any copper replacement separately.
- [Are sockets in skirting boards illegal?](https://lightingelectrical.co.uk/problems/sockets-in-skirting-boards): No, low sockets are not illegal. The age and condition of the wiring behind them is what an EICR tests.
- [Automatic gate not opening](https://lightingelectrical.co.uk/problems/electric-gate-not-working): A gate that will not move has lost its supply, its safety beam or its motor control, so the outdoor circuit needs a test.

## Sources
- [IET: Code of Practice for Electric Vehicle Charging Equipment Installation](https://electrical.theiet.org/guidance-and-codes-of-practice/publications-by-category/electric-vehicles/)
- [National Grid Electricity Distribution: Electric vehicles](https://www.nationalgrid.co.uk/customers-and-community/electric-vehicles)
- [105: Find your electricity network operator](https://www.105.co.uk/)
- [GOV.UK: Connecting electric vehicle chargepoints to the electricity network](https://www.gov.uk/government/publications/connecting-electric-vehicle-chargepoints-to-the-electricity-network/connecting-electric-vehicle-chargepoints-to-the-electricity-network)

Updated 2026-11-20.

[EV charger installation](https://lightingelectrical.co.uk/services/ev-charger-installation)

## Book or ask a question
- [Book Now](https://lightingelectrical.co.uk/#chat)
