---
title: "Two electric cars and one charge point | 4.7 Star · From £60"
description: "Two electric cars and one charge point in Peterborough: why one unit struggles, what to check safely, when to book and how a second charger is fitted."
canonical: "https://lightingelectrical.co.uk/problems/two-cars-one-charge-point"
---

# Two electric cars and one charge point

> Two electric cars and one charge point in Peterborough: why one unit struggles, what to check safely, when to book and how a second charger is fitted.

Two cars can share one charge point by taking turns, and two chargers can run together when they share the spare current. Lighting Electrical in Peterborough fits and sets up both arrangements.

## Why does one charge point not suit two electric cars?

A single charge point has one socket and draws from one circuit, so trouble starts when both drivers need a full battery by morning.
- **One socket, one car at a time:** A charge point with one socket serves one car at a time. The second car waits for the first to finish, so a tight morning leaves one driver short.
- **Limited headroom on the supply:** Every home supply carries a fixed amount of current, and the house already uses part of it. Two chargers running at full rate together can ask for more than the supply can give.
- **No spare way at the consumer unit:** A charger needs its own circuit, and the consumer unit, which is the fuse board, needs a free way for it. A full board needs work before a second circuit can be added.
- **Chargers that do not know about each other:** Two units fitted separately each assume they have the whole supply. Without load sharing, set when the units are commissioned, nothing stops both drawing full current at once.
- **Cars parked too far apart:** A lead that crosses a path or a parking space is a trip hazard and may not reach. Where the cars sit apart, one unit cannot serve both.
- **New load added since the first install:** A heat pump, electric shower, solar array or battery added later takes headroom that the first charger assumed was free.

## What can I check safely before booking a second charger?

You can look at where the cars park and how the charger is set, with every cover left closed and no wiring touched.
- **Where each car parks:** Stand each car in its usual place and see whether the charging lead reaches without crossing a path or the other car's space.
- **The schedule on the charger or the car:** Look in the charger app or the car's charging timer for a schedule. Setting the cars to charge in turns overnight shows whether one unit is enough.
- **The label on the outside of the charger:** Photograph the make and model printed on the outer label. We use it to check whether that unit can share current with a second one.
- **What has been added since:** Write down any heat pump, electric shower, solar or battery fitted since the charger went in. Each one changes how much current is left for another unit.

## When should I book a second EV charger?

Book when taking turns no longer works for the household, or before a second charger is ordered.
- **Both cars must be full by morning:** If a shared overnight window leaves one car short, a second charger or a twin unit gives each car its own socket.
- **A second car is on its way:** Book before delivery so the supply is assessed with two chargers in it, not after a second unit has been bought.
- **The charger trips or stops mid charge:** A charger that trips its breaker or drops out needs testing before any second circuit is added beside it.
- **A large new load has gone in:** A heat pump, shower or battery fitted since the first install changes what the supply can carry, so the sums are done again.

## What happens when a second charger is fitted?

The visit runs in order: assess the supply, settle the layout, fit the circuit, then test and hand over.
- **Supply, earthing and board checked:** Valandi Kotorri checks the earthing, the bonding and whether the supply will carry another load before pricing the second charger. The consumer unit and the wall or post are looked at too.
- **Twin unit or second unit, then load sharing:** We settle whether a twin socket unit or a second wall unit suits where the cars park, then set the units to share the spare current when they are commissioned.
- **Circuit and charger fitted:** We isolate the board, run a dedicated circuit, mount the unit and terminate the cable. If the run differs from the quote, we stop and give a new written price before cutting in.
- **Testing, first charge and certificate:** We test the circuit and the unit, start a charge if a car is on site, show you the isolator and hand over the certificate. We tell you if the street supply needs a notice or an upgrade.

## What does a second charger installation cost?

The price pays for the supply check, a dedicated circuit, the charge point, the cable and the testing that ends in a certificate. It moves with the cable length, whether one twin unit or two separate units go in, and any work needed at the board.
- EV charger installation (7.4kW): from £750
- A twin socket unit needs one cable run and two separate units need two, so the layout of the parking changes the work.
- A full consumer unit or extra earth work is added as its own line on the written quote.
- Work at the street, such as a network notice or upgrade, sits outside the charger price.

## EV charger installation near you
- [EV charger installation in Marks Tey](https://lightingelectrical.co.uk/electrician-marks-tey/ev-charger-installation)
- [EV charger installation in Maldon](https://lightingelectrical.co.uk/electrician-maldon/ev-charger-installation)
- [EV charger installation in Rowhedge](https://lightingelectrical.co.uk/electrician-rowhedge/ev-charger-installation)

## Questions about charging two cars at home

### Can two electric cars share one charge point?

Yes, by taking turns. One socket charges one car at a time, so the cars plug in one after the other or use their own timers to split the night. It suits a household only if each car is ready when its driver needs it.

### If I fit two chargers, will they overload my supply?

Not when they share the spare current. We set the units to divide whatever the house is not using, so the pair stays inside the supply's limit. Two units left to run at full rate together can ask for more than many homes can carry.

### Is a twin socket unit better than two separate chargers?

A twin unit needs one cable run and one enclosure, and the sharing is built in, which suits cars parked close together. Two separate units suit cars parked far apart, and each can be replaced on its own.

### Will the electricity network need telling about a second charger?

We tell you when the charge point needs a notice or an upgrade at the street. That network work is not part of the charger price.

### Do I get a certificate for the second charger?

Yes. We test the circuit and the charge point, then hand over a certificate for the work. Lighting Electrical is NAPIT registered for that paperwork.

## Related problems
- [How far can an EV charger be from the consumer unit](https://lightingelectrical.co.uk/problems/charge-point-too-far-from-the-car): A distant parking space can take a charge point when a new cable is sized from the consumer unit to the bay.
- [Problems after EV charger installation](https://lightingelectrical.co.uk/problems/ev-charger-installation-issues): A trip, a refused start or a slow charge after fitting points to the charger circuit, the earth path or the house supply.
- [Told your supply is too small for a 7kW charger](https://lightingelectrical.co.uk/problems/supply-too-small-for-a-charge-point): A 7.4kW charger draws around 32 amps for hours, so the survey adds it to what the house already uses and picks a full power, limited or sensor controlled setup.
- [Aluminium wiring in the house](https://lightingelectrical.co.uk/problems/aluminium-wiring): Aluminium cable overheats at loose joints. We test it, write the electrical installation condition report, and price any copper replacement separately.
- [Are sockets in skirting boards illegal?](https://lightingelectrical.co.uk/problems/sockets-in-skirting-boards): No, low sockets are not illegal. The age and condition of the wiring behind them is what an EICR tests.
- [Automatic gate not opening](https://lightingelectrical.co.uk/problems/electric-gate-not-working): A gate that will not move has lost its supply, its safety beam or its motor control, so the outdoor circuit needs a test.

## Sources
- [IET: Code of Practice for Electric Vehicle Charging Equipment Installation](https://electrical.theiet.org/guidance-and-codes-of-practice/publications-by-category/electric-vehicles/)
- [National Grid Electricity Distribution: Electric vehicles](https://www.nationalgrid.co.uk/customers-and-community/electric-vehicles)
- [GOV.UK: Smart chargepoint regulations](https://www.gov.uk/guidance/regulations-electric-vehicle-smart-charge-points)

Updated 2026-11-20.

[EV charger installation](https://lightingelectrical.co.uk/services/ev-charger-installation)

## Book or ask a question
- [Book Now](https://lightingelectrical.co.uk/#chat)
