EV charger installation in Maldon
Need an EV charger installed at a Maldon property? Lighting Electrical checks the main fuse, existing electrical demand, earthing and route from the consumer unit to the parking space before fitting the charger. Valandi plans carefully around older streets where off street parking may sit behind or beside the house.
Calls answered 24/7
- 10 years trading
How much does an EV charger cost in Maldon?
The charger quote covers fitting the charge point and its circuit at the property. The cable run, parking position and existing supply determine the installation work.
From £750
Included when agreed
- A look at the consumer unit, earthing and the proposed wall or post before we order the unit
- Supply and fitting of a 7.4kW single phase chargepoint on a dedicated circuit
- Cable, isolation, RCD protection and labelling for that circuit
- Testing of the circuit and the chargepoint, then a certificate for the work
- A walk through of how to start a charge and how to isolate the unit
Ways to pay


- Pay by bank
- Bank transfer
- The written charger quote follows the property's cable run, parking position and electrical supply.
- Consumer unit replacement is quoted separately if the fuse board needs changing to accept the new charger circuit.
EV charger installation across Maldon
We serve Maldon from our base in Peterborough.
What happens on the day
We arrive, fit the 7.4kW charger on its own circuit, then test it and leave the certificate.
- When we arriveWe check the consumer unit, the parking space and how the cable will pass through the house or garden.
- Fitting the chargerWe run the new circuit, mount the 7.4kW charger where you park, and connect it at the board.
- Test and certificateWe test the new installation and leave the certificate with you before we go.
How booking works
Tell us about the job
Tap Book Now and describe the work in the chat. Photos help.
Get your price
You see your price in the chat. A set price is paid at checkout; any other job is quoted first.
Choose your visit
Give your address and when you are free, and the visit is arranged.
Follow your job from booking to receipt
See when we're on our way, get your job report the moment we finish, and pay in seconds.
Track us on our way
See us on the map with a live arrival time.
Your job report, same day
See exactly what was done as soon as we finish.
Invoice and receipt in one place
Pay online in seconds, and your receipt is always there when you need it.
Why choose Lighting Electrical
- Reviews
- 61
- Rating
- 4.7
- Trading since
- 2016
“Ten years on Colchester housing stock and I have seen most of it: terraces where the lighting circuit has been extended once too often, boards fitted before RCDs were standard, new builds with sockets nowhere near the kitchen. I check the earthing, the bonding and whether the supply will carry another load before I price anything, because the age of a house settles nothing on its own.”
Valandi Kotorri, Lighting Electrical
Book NowPhotos of our work
What do you check before fitting an EV charger?
Lighting Electrical installs 7.4kW EV chargers. The proposed charger position, consumer unit and electrical supply are checked before the installation work is quoted.
How much does a 7.4kW EV charger cost?
We give you a written price for the EV charger installation before starting. If the consumer unit needs changing to accept the charger circuit, that work is quoted separately so you can see what each part of the installation covers.
Can you fit a charger on a High Street house?
Yes. The High Street houses that sit on several levels have no one loft to pull through, so Lighting Electrical plans the charger cable through the rooms in between. The 7.4kW charger still ends at the parking space.
What needs checking before an EV charger can be connected?
The electrical supply, consumer unit and planned circuit are checked for the 7.4kW charger. The installation connects the charge point through suitable cabling and circuit protection, followed by electrical testing.
Do I need a new fuse board?
Only if the existing consumer unit cannot accept the new charger circuit. We check its position, available space and the supply before quoting. Any board replacement is explained and priced separately from fitting the charger.

