Told your supply is too small for a 7kW charger

A 60 amp main fuse does not rule out a 7kW charger. Lighting Electrical in Peterborough adds up what the house already draws, then sets the charger to suit what the supply can carry.

Calls answered 24/7

  • 10 years trading
  • Local to Peterborough

Not sure? We'll check for you.

Why am I told my supply is too small for a 7kW charger?

The service cutout, the sealed fuse box where the supply enters, caps what the whole house can draw. A charger adds a long, steady load on top of cooking, showers and heating.

  • A cutout rated at 60 ampsThe network operator owns the cutout. At 60 amps it leaves little room once a 32 amp charger is added to a normal evening in the house.
  • Electric cooking, shower and immersion heaterThese already take much of the current at the hours a car is usually plugged in. A charger on top can push the total past what the cutout carries.
  • A heat pump or second charger added sinceEquipment fitted after the supply was first sized uses up headroom. The survey counts it before any charger goes on the list.
  • Meter tails or a board too smallMeter tails are the thick cables between the meter and the consumer unit. If they or the board cannot take another 32 amp circuit, they need uprating before a charger joins them.
  • One cutout feeding more than one homeOn a shared or looped service the capacity is split between homes. The load of everything on that cutout is counted, not one home's alone.

What can I look at myself without opening anything?

Everything here is done from outside. The cutout stays sealed, every cover stays on and the meter tails stay untouched.

  • The number on the cutoutThe fuse carrier beside the meter is usually marked 60, 80 or 100. Read it from where you stand and note it down.
  • What runs on electricityNote whether cooking and hot water are electric or gas, and whether there is an electric shower, a heat pump or an existing charger.
  • Who runs your supply105 is the free number that names the network operator for your street. Only that operator changes the cutout fuse or the cable feeding the house.
  • A photo of the closed boardTake a picture of the consumer unit with its cover shut, plus the parking space and the wall you have in mind for the charger.

When is it time to book a survey?

Book Now before the charger is ordered, because the survey decides which setup the supply allows and what it needs.

  • Someone has called the main fuse too smallOne rating does not settle it. The survey counts the real demand in the house against the cutout.
  • The consumer unit is full or olderA charger needs its own protected circuit, so the board needs a spare way and suitable protection first.
  • The parking space is far from the meterA long cable run changes the work. The survey measures it so the length shows on the written quote.

What happens at the survey visit?

The visit works out what the supply carries before a charger is chosen, so the written quote reflects the house as it stands.

  • The supply and board are looked atWe read the cutout rating, check the meter tails and main switch, and look at the consumer unit and earthing for a new 32 amp circuit.
  • Demand is added upCooking, hot water, heating and any heat pump are counted against the cutout. That shows whether the charger fits whole, fits with a sensor, or needs limiting.
  • Load control and output are set outWhere headroom is tight, a sensor clamped round the incoming cable tells the charger to ease off when the house draws more. We set the top output to match.
  • The network operator is toldA charger installation is notified to the network operator, and the work is notified through our NAPIT registration. A supply upgrade is the operator's job, and we explain what they ask for.

What does the charger price cover and what changes it?

The price covers fitting a 7.4kW single phase charger on its own circuit, with the usual cable run, testing and the certificate. Anything the survey finds beyond that, such as board work or a longer run, appears as its own line on the written quote.

From £750

Included when agreed

  • A look at the consumer unit, earthing and the proposed wall or post before we order the unit
  • Supply and fitting of a 7.4kW single phase chargepoint on a dedicated circuit
  • Cable, isolation, RCD protection and labelling for that circuit
  • Testing of the circuit and the chargepoint, then a certificate for the work
  • A walk through of how to start a charge and how to isolate the unit

Not included automatically

  • A new consumer unit, a three phase supply or a network upgrade at the street
  • Groundworks, a new driveway post base or making good plaster and brick beyond the fixing
  • A 22kW unit, a forklift charger or a commercial bank of bays

Ways to pay

  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay
  • Klarna
  • Pay by bank
  • Bank transfer
  • A supply upgrade by the network operator is separate work and sits outside the installation price.
  • A full or unsuitable consumer unit adds board work, priced on its own line before anything starts.
  • Fitting a sensor for load control, or setting a lower output, changes what is installed, so the quote states which applies.

View the EV charger installation cost guide

EV charger installation near you

How booking works

  1. Tell us about the job

    Tap Book Now and describe the work in the chat. Photos help.

  2. Get your price

    You see your price in the chat. A set price is paid at checkout; any other job is quoted first.

  3. Choose your visit

    Give your address and when you are free, and the visit is arranged.

Why choose Lighting Electrical

We work with Hager, Wylex, Contactum, BG Electrical, MK Electric, Varilight, myenergi, Ohme, Hypervolt, Andersen, Aico, FireAngel and Mira.

Photo of Valandi KotorriValandi KotorriElectrician
Reviews
63
Rating
4.7
Trading since
2016
“Ten years on Colchester housing stock and I have seen most of it: terraces where the lighting circuit has been extended once too often, boards fitted before RCDs were standard, new builds with sockets nowhere near the kitchen. I check the earthing, the bonding and whether the supply will carry another load before I price anything, because the age of a house settles nothing on its own.”

Valandi Kotorri, Lighting Electrical

Book Now

Questions about a 7kW charger on a small supply

Still have a question?

Can I have my main fuse upgraded?

Only the network operator can change it, and whether they can depends on the cable feeding the house as well as the fuse. 105 tells you who yours is. We explain what they ask for if an upgrade is the answer.

What does load management do to my charging?

It eases the charger back when the rest of the house draws more and lets it rise again when the load falls. Most of a charge happens overnight while the house is quiet.

Is a lower power charger worth having?

A 3.6kW unit charges at about half the speed, which over a night is still far more than a three pin socket gives. Where the supply cannot carry more, it is a proper answer, and many units can be raised later.

Do I need to tell the network operator myself?

No. We notify the network operator about the charger, and the work is notified through our NAPIT registration. Both are part of the installation.

Related problems

Sources

Updated 20 November 2026

Book or ask a question

Calls answered 24/7