How far can an EV charger be from the consumer unit

The parking space can sit well away from the meter. Lighting Electrical sizes a new cable for that length and fits the charge point where the car actually parks.

Calls answered 24/7

  • 10 years trading

Why is the parking space so far from the meter?

The meter was sited for the incoming supply, and the parking space was sited for the car. Those two spots sit on different sides of the house, so the charge point needs its own cable sized for the gap.

  • The meter and the bay sit far apartThe consumer unit, the fuse board, stands near the meter at the front or in a cupboard. The drive, garage or private bay is at the side or the back. The charge point has to stand by the car, so the new circuit has to cover that gap.
  • A tethered lead only reaches so farA tethered lead is the cable fixed to the charge point. It meets the car inlet only when the unit is close to the bay. A unit on the near wall still leaves you pulling that lead across the garden.
  • A three pin socket was used for the carA three pin socket on the house is not sized for a car that charges for several hours. It gets used when the right spot is far from the board. That socket stays off the new circuit we fit for the charge point.
  • The old cable is too small for the loadA 7.4kW charge point draws a heavy current for hours. Voltage drop is the loss of voltage along a long cable. A cable sized for sockets falls outside the voltage drop limit when it carries this load over a long distance. We fit a new cable of the right size, and we leave the old socket cable on its own circuit.
  • No wall sits beside the carSome private bays have lawn or gravel between the house and the inlet. A wall unit then leaves the lead short. A pedestal in the bay puts the charge point next to the car, and the new cable still starts at the consumer unit.

What can you check safely before booking?

You can pace the outside gap, read the closed fuse board and see whether a lead would reach the inlet. You leave the consumer unit shut, and you do not touch a cable, a meter seal or a charger terminal.

  • Pace the gap from the meter to the carWalk the outside path a cable would follow, from the meter cupboard to the parking place. Note each wall, fence and path crossing. Keep the cupboard shut. Bring that note to the booking so we can size the new cable.
  • See if a lead reaches the inletPark in the usual place. Hold a charging lead from the nearest house wall toward the inlet. If it falls short without crossing a walkway, the charge point needs a closer wall or a post in the bay. You do not need to plug it in.
  • Look for a spare way on the fuse boardA spare way is an empty breaker space in the consumer unit. Look for one through the window only. No empty space means we check the board before adding the new circuit. Leave the cover screws alone.
  • Note what sits between the wall and the carWrite down a gate, a bed, a drain or a step on the way to the bay. Say whether the car stands on your drive, in a garage or on a private bay. That sets the unit position. It needs no tool and no cover removed.

When should you book if the bay is far from the meter?

Book Now when a lead from the house wall cannot reach the inlet, or when the charge point should stand on the bay rather than beside the meter. A three pin socket kept for the car is the point where this job starts.

  • The lead will not reach the parked carYou have tried from the nearest outside wall. The lead still misses the inlet with the car in its normal place. The charge point has to move toward the car on a new cable from the consumer unit. A household extension is not the fix.
  • The right spot is a post in the bayYou want the unit beside the car, not on the wall next to the meter. A pedestal and the long cable need a written price before fitting day. Book Now so we can measure that path and the fixing.
  • The board is full or the path is outsideNo spare way shows through the cover, or the cable would run in the open around the house. Either one changes the work we quote. We inspect the board and the path before we write the price.

What happens on a visit when the bay is far away?

We measure from the consumer unit to the charge point by the car, then fit a new circuit for that unit alone. A cable already fixed to the house for sockets or lights is not this circuit.

  • Measure the path and the fixing pointWe walk from the consumer unit to the parking place with you. We set the line of the new cable and the spot for the wall unit or pedestal. A path that differs from the priced one gets a fresh written price before any fixing starts.
  • Check the supply before the new circuitWe test earthing, the fault path back to the board, and bonding, the links from metal pipes to that path. We see whether the supply can feed the charger and the house together. For an outdoor unit we confirm it can disconnect if the street neutral and earth conductor opens.
  • Fit the new cable and the charge pointWe switch off the board and install a dedicated circuit, a cable used only by the charge point. A longer run uses a larger conductor so voltage drop stays inside the limit. Open air sections use armoured cable, with its steel wire layer for protection. We mount the 7.4kW unit and connect it. The old socket circuit is left as it was.
  • Test the circuit and hand over the unitWe test the new circuit and the charge point, and we start a charge if your car is there. You get the certificate for this circuit, with our NAPIT registration on it. We show you the isolator, the switch that cuts power to the unit.

What does a far charge point cost?

The price covers a 7.4kW single phase charge point, its new cable for that unit alone and the tests, where the consumer unit can take the circuit and the path is a short one beside the house. A long path to the parking space, a thicker cable, a pedestal, extra earth work or fuse board work changes that written price. Any upgrade on the street supply is separate.

From £750

Included when agreed

  • A look at the consumer unit, earthing and the proposed wall or post before we order the unit
  • Supply and fitting of a 7.4kW single phase chargepoint on a dedicated circuit
  • Cable, isolation, RCD protection and labelling for that circuit
  • Testing of the circuit and the chargepoint, then a certificate for the work
  • A walk through of how to start a charge and how to isolate the unit

Not included automatically

  • A new consumer unit, a three phase supply or a network upgrade at the street
  • Groundworks, a new driveway post base or making good plaster and brick beyond the fixing
  • A 22kW unit, a forklift charger or a commercial bank of bays

Ways to pay

  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay
  • Klarna
  • Pay by bank
  • Bank transfer
  • The short path price includes the charge point, the new cable, the safety switch and the tests on that circuit.
  • A run around the house, armoured cable, or a pedestal in the bay is added as its own line on the written price.
  • Fuse board replacement, and a notice or upgrade for the street supply, are each priced apart from the charge point.

View the EV charger installation cost guide

How booking works

  1. Tell us about the job

    Tap Book Now and describe the work in the chat. Photos help.

  2. Get your price

    You see your price in the chat. A set price is paid at checkout; any other job is quoted first.

  3. Choose your visit

    Give your address and when you are free, and the visit is arranged.

Why choose Lighting Electrical

We work with Hager, Wylex, Contactum, BG Electrical, MK Electric, Varilight, myenergi, Ohme, Hypervolt, Andersen, Aico, FireAngel and Mira.

Photo of Valandi KotorriValandi KotorriElectrician
Reviews
61
Rating
4.7
Trading since
2016
“Ten years on Colchester housing stock and I have seen most of it: terraces where the lighting circuit has been extended once too often, boards fitted before RCDs were standard, new builds with sockets nowhere near the kitchen. I check the earthing, the bonding and whether the supply will carry another load before I price anything, because the age of a house settles nothing on its own.”

Valandi Kotorri, Lighting Electrical

Book Now

Questions about a charger far from the meter

Still have a question?

How far can an EV charger be from the consumer unit?

There is no fixed maximum distance. The wiring regulations limit voltage drop, so we pick a new cable size that keeps this 7.4kW circuit inside that limit on the path we measure. A longer bay needs a thicker cable, and it does not use a household extension lead.

Can the charge point sit next to my car?

Yes. We put the unit on a close wall or on a pedestal so the tethered lead meets the inlet. The new cable runs from the consumer unit to that unit. We do not reuse the existing socket cable for the charger.

Does a long cable mean a new fuse board?

Not by itself. We change the board only when it has no spare way or the wrong protection for a charge point. Fuse board replacement then has its own written price.

Will you sort the electricity network too?

We tell you if the supply company needs notice, or if the incoming supply has to be increased. Street work is written separately from the charge point. The check on your supply comes before we set the price.

Does the charger have to be a smart unit?

Yes. A new home charge point has to be smart, and we fit Ohme, myenergi, Hypervolt and Andersen units for that home job. Smart controls do not shorten the run, so we still size the new cable for the bay.