Problems after EV charger installation
After an EV charger is fitted, a trip, a refused charge or a slow charge is a fault on that circuit or the supply. Lighting Electrical tests the 7.4kW unit in Peterborough and tells you which part failed.
Calls answered 24/7
- 10 years trading
Why does an EV charger fail after fitting?
A 7.4kW charge point fails after fitting when its circuit, the earth path or the house supply cannot support a charge. Lights and sockets on other circuits can stay on.
- The charger RCBO keeps openingAn RCBO is one device that guards a single circuit against overload and against current leaking to earth. Earth is the path that carries a fault away from you. When the charger RCBO opens, that circuit goes dead and the other breakers can stay up.
- The earth path stops the chargeA home charge point can refuse to start when the earth reading is poor. It can also stop when its open PEN device sees a fault on the combined protective earth and neutral. We check earthing and bonding before any further price. Bonding joins metal pipes and services to the fuse board earth.
- The house supply is near its limitA 7.4kW charger is a large steady load on a single phase supply. The charge can cut out when the shower or oven runs at the same time. We check that the supply can carry this extra load before we price any change.
- The RCD is the wrong typeAn RCD is a switch that opens when current leaks to earth. A car can leak a little direct current that an older RCD cannot handle, so the switch opens during a charge. The dedicated circuit needs the RCD type that this charge point requires.
- A schedule or a clamp limits chargingA smart charge point can wait, follow an off peak setting, or reduce power from a clamp around the meter tail. The clamp is a sensor that reads how much current the house is using. A loose clamp or a held schedule makes the unit look dead or very slow.
- The lead or the isolator has failedA tethered lead is fixed to the unit. A bent pin, water in the vehicle plug, or a loose joint at the outdoor isolator stops the charge. An isolator is the switch that cuts power to the charge point. Heat at that switch needs a test.
What can you check safely on the charger?
You can use the car, the charge point lamp and the closed fuse board. Leave the charger cover, the fuse board cover and every cable joint shut.
- The plug, the car and the unit lampUnplug the car, then push the plug home until it clicks. Read the car charge screen and the lamp on the unit. If that car charges on another unit you already use, the fault is more likely on this house circuit.
- The charger switch with the cover shutRead the switch named for the charger through the closed fuse board cover. A switch sitting down has opened. If the board is cool, silent and free of a burning smell, reset that switch once. If it opens again, leave it down.
- A charge with large appliances offSwitch the oven off and leave the electric shower off. Start one charge. If the charger runs only while those loads are off, the supply is near its limit. Leave both appliance switches as they are afterwards.
- The app and the outdoor isolatorOpen the charger app and see whether a schedule is holding the charge. Look at the isolator beside the unit. If that switch is off, the unit has no power. Do not open the isolator or the charge point.
When should you book for an EV charger fault?
Book Now if one reset will not hold, the charge point is hot or smells of burning, or the car will not charge when the schedule is off.
- The charger switch opens againThe car was unplugged and the switch still opened at once. The fault is in the circuit, the unit or the car. Another reset heats the device. Leave that switch off.
- Heat, a buzz or a burning smellA warm charge point, a buzz or brown marks at the isolator means a joint is failing. Use the charger switch on the fuse board to turn that circuit off. Keep every cover shut.
- The car will not take a chargeThe lead is seated, the isolator is on, and the app shows no delay. The car still takes no power. The earth check in the unit, or the contactor that connects power to the car, needs a test.
- Water or damage on the outdoor unitRain has entered the plug, the tethered lead is cut, or the wall box is loose. Water on a live charge pin is a shock risk. Leave the charger switch off.
What happens on a visit for a charger fault?
We test the 7.4kW circuit from the fuse board and name the failed part before any repair. The repair starts only after you accept the written price.
- What stopped and what you already triedWe ask when the charge stopped, which car you plug in, and what the app showed. We read the charger switch with you while the fuse board cover stays on. We note any reset you have already tried.
- Tests on the dedicated circuitWe switch off only the charger circuit. Dead tests look for a broken conductor, a short and leakage to earth. We test the earth path and the bonding. We also test whether the supply can carry the charger with the house load.
- The unit, the lead and the isolatorWe open the charge point and the isolator only after a tester shows the circuit is dead. We check the terminations, the tethered lead and the RCD type. Units we fit include myenergi, Ohme, Hypervolt and Andersen. A joint that tests sound stays as it is.
- Repair, retest and the certificateThe repair of the failed cable, joint, switch or unit starts after you accept the written price. We test the circuit again after that work. Where the circuit changes, Lighting Electrical issues the electrical certificate. We are NAPIT registered.
What does an EV charger fault visit cost?
The written price covers tests on the charger circuit, the spoken findings, and the repair after you accept it. A replacement charge point, fuse board replacement, extra earth work or a longer cable run changes the price. Work the electricity network does at the street is a separate price.
From £750
Included when agreed
- A look at the consumer unit, earthing and the proposed wall or post before we order the unit
- Supply and fitting of a 7.4kW single phase chargepoint on a dedicated circuit
- Cable, isolation, RCD protection and labelling for that circuit
- Testing of the circuit and the chargepoint, then a certificate for the work
- A walk through of how to start a charge and how to isolate the unit
Not included automatically
- A new consumer unit, a three phase supply or a network upgrade at the street
- Groundworks, a new driveway post base or making good plaster and brick beyond the fixing
- A 22kW unit, a forklift charger or a commercial bank of bays
Ways to pay


- Pay by bank
- Bank transfer
- Tracing a trip at the charger switch takes less time than testing a leak on a long cable to a bay.
- A myenergi, Ohme, Hypervolt or Andersen part is added only when the tests show that the unit has failed.
- Fuse board replacement and any electricity network work are each given their own written price.
How booking works
Tell us about the job
Tap Book Now and describe the work in the chat. Photos help.
Get your price
You see your price in the chat. A set price is paid at checkout; any other job is quoted first.
Choose your visit
Give your address and when you are free, and the visit is arranged.
Why choose Lighting Electrical
We work with Hager, Wylex, Contactum, BG Electrical, MK Electric, Varilight, myenergi, Ohme, Hypervolt, Andersen, Aico, FireAngel and Mira.
- Reviews
- 61
- Rating
- 4.7
- Trading since
- 2016
“Ten years on Colchester housing stock and I have seen most of it: terraces where the lighting circuit has been extended once too often, boards fitted before RCDs were standard, new builds with sockets nowhere near the kitchen. I check the earthing, the bonding and whether the supply will carry another load before I price anything, because the age of a house settles nothing on its own.”
Valandi Kotorri, Lighting Electrical
Book NowCan the rest of the house stay on while you test?
Yes. We switch off the charger circuit. Every other breaker stays as it is. The charger circuit goes back on when the tests show it is sound, and it stays off when it cannot be left live.
Do I need a new fuse board for this fault?
Only if the tests show this board cannot protect the charger. A full board or an RCD of the wrong type is priced as fuse board replacement. A board that tests sound stays in place.
Will you change the charge point before the tests?
No. We name the failed cable, joint, switch or unit before anything is replaced. A new charge point goes on only after you accept that written price. A unit that tests sound stays on the wall.
What paperwork is left after the repair?
Where the circuit is changed, we issue an electrical certificate for that work. Lighting Electrical is NAPIT registered, and the certificate carries that registration. If nothing is changed, we still write down the readings and the failed part.
Why is my new charger slow to start?
A smart charge point may wait several minutes, follow an off peak setting, or limit power from the clamp at the meter. If charge now is selected and the car still takes little power, the circuit and the supply need a test. The tests show which of those it is.
Related problems
- How far can an EV charger be from the consumer unitA distant parking space can take a charge point when a new cable is sized from the consumer unit to the bay.
- Aluminium wiring in the houseAluminium cable overheats at loose joints. We test it, write the electrical installation condition report, and price any copper replacement separately.
- Automatic gate not openingA gate that will not move has lost its supply, its safety beam or its motor control, so the outdoor circuit needs a test.
- Bathroom fan stopped workingA stopped extractor fan means a seized motor, an open switch, or a fault on the circuit that feeds it.
- Brown marks on a socket or plugBrown marks on a socket or plug mean the connection has overheated, so that circuit stays off until it is tested.
- Burning plastic smell from electricsA burning plastic smell means the insulation on a live joint is getting hot, so that circuit stays switched off until it is tested.
Sources
- IET: Code of Practice for Electric Vehicle Charging
- BS 7671: IET Wiring Regulations (18th Edition)
- Smart chargepoint regulations
- HM Government: Approved Document P (Electrical Safety)
Updated 16 November 2026