Aluminium wiring in the house

Loose aluminium joints overheat behind switches and sockets. Lighting Electrical in Peterborough tests the circuits and writes an electrical installation condition report, called an EICR, then prices copper replacement as its own job.

Calls answered 24/7

  • 10 years trading

Why does aluminium wiring overheat?

Aluminium cable fails at the joints, not along the middle of the run. The metal moves, oxidises and fights the brass or copper it is clamped to.

  • The core creeps under the screwCreep means the aluminium slowly squashes under a tight screw. The joint that was tight becomes loose. A loose joint sparks and heats the cable end behind the switch or socket.
  • Oxide on the bare metalBare aluminium grows a dull oxide skin in air. That skin resists current. Current through a resistant joint turns into heat at the terminal, even when the rest of the cable looks sound.
  • Aluminium clamped to brass or copperA brass terminal or a copper tail is a different metal from the aluminium core. Damp air at that joint eats the aluminium. The damaged end runs hotter each time the circuit is used.
  • A later fitting on an old coreA new socket, a dimmer or a fuse board made for copper cores grips aluminium badly. The screw cuts the soft core or leaves it loose. Heat starts at that new joint.
  • More load on the old circuitExtra lights or a heavier appliance raise the current in the old cable. A joint that was only warm starts to char. The age of the house does not show whether the cable can take that load.

What can I check with the covers on?

Look, smell and try a lamp you already trust. Leave every screw in place and keep the fuse board cover shut.

  • Warm plates and brown marksFeel the outside of a switch or socket with the back of your hand. A warm plate, brown stains or a smell of hot plastic means the joint behind it is heating. Stop using that point.
  • Lights that flicker and returnWatch for lights that dip, flicker or go out and then come back on one floor. That pattern points to a loose joint on the lighting circuit. A single spent lamp in a cool fitting is a different fault.
  • Paper that already names aluminiumRead any electrical report or invoice you already hold. If the paper names aluminium cable, keep it for the visit. You do not open the fuse board to confirm the word.
  • Cable already in plain viewIn a loft or a cupboard, look only at cable that is already uncovered. A silver core, not red or brown copper, is aluminium. Do not pull the cable, cut the sheath or lift a floorboard.

When should I book for aluminium wiring?

Book Now when a joint is heating, when lights flicker and a plate is warm, or when you already know the cable is aluminium and you want it tested.

  • Heat, smell or scorch marksA burning smell, a hot plate or brown plastic means the joint is arcing. Arcing is a spark across a loose connection. Leave that circuit switched off at the breaker handle and Book Now.
  • Flicker together with a warm plateFlicker on its own can be a lamp. Flicker plus a warm switch or socket means the aluminium joint is moving. Book Now before that joint chars the cable.
  • You plan a new heavy loadAn electric shower, more lighting or an EV charger adds load. We inspect the aluminium circuits before we price that new work. Book the inspection first.
  • A rented home with this cableA private rented home has to hold a current EICR. If the cable is aluminium, the inspection records the joints and the test results. Book Now so the report is ready for the tenancy file.

What happens on a visit for aluminium wiring?

We find the aluminium, test it, write the EICR, and price the next job when the joints or the fuse board cannot stay.

  • Where the aluminium isWe walk the rooms with you and note any warm fittings. We open the fuse board and separate silver aluminium cores from copper on each circuit. We also look at cable already visible in a loft or cupboard.
  • Tests with the circuit off, then onWe switch off the circuit under test. Dead tests check that the cores still connect and that current does not leak between them. A live test then checks the earthing, which is the path that carries fault current away. We do not pinch the soft aluminium ends during these tests.
  • The EICR and each observationWe write the EICR during the visit and talk it through before we leave. Each observation is recorded as C1, C2, C3 or FI. C1 means danger present. C2 means potentially dangerous and makes the report unsatisfactory. C3 means improvement recommended. FI means further investigation.
  • The price for the work that followsWhere a joint or the fuse board cannot keep the aluminium in service, we write a separate price before we leave. That price is for a joint repair, fuse board replacement, or house rewiring onto copper. The repair starts on a later visit only after you accept the price. The inspection price does not pay for that work.

What does an aluminium wiring inspection cost?

The price covers the inspection of the fixed wiring, the tests on any aluminium circuits we find, and the written electrical installation condition report. A house with more circuits, an outbuilding or a shop layout takes longer and changes the price. Repair of failed joints, fuse board replacement and house rewiring are each priced on their own after the report.

From £150

Included in the inspection

  • Visual check of the consumer unit, cabling, sockets, switches and fixed lighting
  • Dead and live tests on the circuits, including earth continuity and insulation resistance
  • Classification of each observation as C1, C2, C3 or FI on the report
  • A written EICR for the property, signed by us
  • A short talk through the findings before we leave

Not included automatically

  • Repair of faults found during the test
  • PAT testing of plug-in appliances
  • A new consumer unit or a rewire

Ways to pay

  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay
  • Klarna
  • Pay by bank
  • Bank transfer
  • Opening and recording many aluminium terminations takes longer than a visual check of a small flat.
  • Connectors, a fuse board or new copper cable go on the price only when the tests show that part has failed.
  • NAPIT registration covers the inspection and the EICR. A later circuit change is written up as a minor works certificate.

View the EICR cost guide

How booking works

  1. Tell us about the job

    Tap Book Now and describe the work in the chat. Photos help.

  2. Get your price

    You see your price in the chat. A set price is paid at checkout; any other job is quoted first.

  3. Choose your visit

    Give your address and when you are free, and the visit is arranged.

Why choose Lighting Electrical

We work with Hager, Wylex, Contactum, BG Electrical, MK Electric, Varilight, myenergi, Ohme, Hypervolt, Andersen, Aico, FireAngel and Mira.

Photo of Valandi KotorriValandi KotorriElectrician
Reviews
61
Rating
4.7
Trading since
2016
“Ten years on Colchester housing stock and I have seen most of it: terraces where the lighting circuit has been extended once too often, boards fitted before RCDs were standard, new builds with sockets nowhere near the kitchen. I check the earthing, the bonding and whether the supply will carry another load before I price anything, because the age of a house settles nothing on its own.”

Valandi Kotorri, Lighting Electrical

Book Now

Questions about aluminium wiring

Still have a question?

Does aluminium wiring have to be replaced?

Sound aluminium with the right terminations stays in service when the tests pass. Loose, oxidised or copper only joints are recorded on the EICR. We then price a joint repair or house rewiring as its own job.

Can you put a new fuse board on aluminium cable?

A new fuse board goes on aluminium only when the terminals suit that metal. A copper only terminal on an aluminium core is the joint that overheats. If the cores cannot be terminated safely, we price house rewiring and the board change waits for copper.

Will you rewire the house on the inspection visit?

The inspection visit covers the tests, the EICR and a written price for what the report shows. House rewiring is a separate job. We start that work on a later visit only after you accept the price.

What should I do if I smell burning?

Switch the affected circuit off at the breaker handle. Do that only from the handle, with the fuse board cover shut. Leave a hot plate alone and Book Now with that circuit still off.

Can I add an EV charger to aluminium wiring?

We test the earthing and the bonding before we price an EV charger on this cable. Earthing is the fault path back to the fuse board. Bonding links metal pipes to that earth. If the aluminium circuits cannot carry the extra load, the charger waits until those circuits are copper.

Related problems

Sources

Updated 16 November 2026

Book or ask a question

Calls answered 24/7