EICR in Witham

An inspection report for a Witham house or let, with every circuit tested and each fault written down by code so you can act on it.

Get a quoteSee price

Share the job details and postcode — the price is confirmed before any work.

EICR work by Lighting Electrical

EICR price in Witham

EICR (electrical safety report)

£150

Fixed price

Full eicr details

EICR in Witham

Most reports here are wanted by a landlord, an agent, or somebody buying an older estate house who would rather know what they are taking on before they exchange.

The estate semis off Cressing Road and the post-war bungalows commonly still run a rewirable board, and that is what a report usually turns on: whether the protection is there, whether earthing and bonding were ever brought up to date, and what each finding costs to put right.

Why choose us

We are NAPIT registered under member number 80815, and NAPIT publish that listing on their own member search, so you can confirm it without asking us for anything. Beyond the registration, the things we hold ourselves to are simple: the fault explained in plain English, a price agreed before the work starts, and the certificate or report the job calls for handed over at the end.

Tell us what you need

Send the job details and you get a straight answer on what is involved and what happens next.

Everything in one place

Your quote, updates, payments and receipts stay together.

Track the job

Photos, access details and updates stay with the job from start to finish.

Know the price

See a price where one is available. Any quoted work is agreed before it starts.

What the inspection covers

The electrician checks and tests the fixed electrical installation, then records the findings.

Included in the inspection

  • Consumer unit, circuit protection and RCDs
  • Fixed wiring and electrical circuits
  • Sockets, switches, lighting and accessible fixed equipment
  • Earthing and bonding arrangements
  • A written report with the inspection results

Not included automatically

  • Portable appliance testing, often called PAT
  • Repair work or replacement parts
  • Further investigation beyond the agreed inspection
  • Areas that cannot be accessed safely

What happens on the day

Knowing what the electrician needs makes the visit easier and reduces avoidable delays.

  1. 01

    Make the electrics accessible

    Provide access to the consumer unit, sockets and other fixed electrical points. Share earlier reports if you have them.

  2. 02

    Allow for brief power interruptions

    Parts of the installation need to be isolated while circuits and protective devices are tested.

  3. 03

    Receive the written report

    The report records the results, any limitations and whether further action is recommended.

Trusted by customers

4.9

Great work in the world thank you

Nicholas
MyJobQuote

I had an EV charger installed by Valand, and I couldn’t be more pleased. From the initial quote to the final inspection, the entire process was smooth and stress-free. He was knowledgeable, friendly, and made sure the charger was positioned exactly where I wanted it. All the necessary certificates provided and warranty as well. Excellent service from start to finish!

egli tollaku
Google

Was with us with in good time, was brilliant at finding the fault and getting us back on with power, highly recommend:)

Tara Elliott
Google

EICR in Witham — FAQs

Does the house have to be empty?+

No, but every room, the loft hatch and the meter cupboard have to be reachable, and the power goes off in sections while we test.

The board is a rewirable one. Does that fail automatically?+

No. Age is not a code on its own. What gets coded is missing or inadequate protection, damaged cable, and earthing or bonding that is not right, and an old board often brings several of those with it.

I let the flat above the shop. Whose board is whose?+

That is settled before testing. The meters share the cupboard but each flat's tails and board belong to that flat, and the report states which one it covers.

What do I do with the codes?+

A C1 means danger now, and we make it safe on the day. A C2 has to be put right for the report to be satisfactory. A C3 is an improvement you can choose. Each is priced separately so you decide.

How often does a rented house need one?+

At least every five years for a private tenancy in England, and again at a change of tenancy if the existing report has run out.

More in Witham

Start with the job details

Tell us the property, the postcode and what is actually happening, and add a photo of the fuse board if a circuit keeps tripping. That is usually enough for us to say which service it maps to and what the next step is. Homeowners, landlords and businesses are all welcome.