EICR in Brightlingsea
An EICR in Brightlingsea from Lighting Electrical gives landlords, buyers and businesses a written condition report on the fixed wiring of the property.
Calls answered 24/7
- 10 years trading
How much an EICR costs
Cost follows the circuit count and the time needed on site, so a small flat sits below a big house or a business unit. The written quote covers the visit, all testing and the report itself.
From £150
Included in the inspection
- Visual check of the consumer unit, cabling, sockets, switches and fixed lighting
- Dead and live tests on the circuits, including earth continuity and insulation resistance
- Classification of each observation as C1, C2, C3 or FI on the report
- A written EICR for the property, signed by us
- A short talk through the findings before we leave
Ways to pay


- Pay by bank
- Bank transfer
- The fee includes every test, the completed certificate and a talk through the findings.
- Premises with more circuits take longer to test and sit higher on price.
- Anything the inspection flags for repair is quoted separately, in writing, afterwards.
EICR across Brightlingsea
We serve Brightlingsea from our base in Peterborough.
What happens on the day
Power goes off while each circuit is tested, so somebody needs to be at the property during the visit.
- Looking at the installationThe visit starts at the consumer unit, then a walk round notes the layout, the fixed wiring and anything you want checked, such as a socket that has stopped working or a breaker that trips.
- Dead and live testingWith the supply isolated, every circuit gets dead and live testing, measuring the resistance of insulation and the continuity of the earth path. Sockets and lights go off in turn, and the supply comes back on as each one is done.
- The written reportFindings are graded on the report: C1, C2, C3 and FI, anything dangerous is made safe straight away and the signed document is left with you.
How booking works
Tell us about the job
Tap Book Now and describe the work in the chat. Photos help.
Get your price
You see your price in the chat. A set price is paid at checkout; any other job is quoted first.
Choose your visit
Give your address and when you are free, and the visit is arranged.
Follow your job from booking to receipt
See when we're on our way, get your job report the moment we finish, and pay in seconds.
Track us on our way
See us on the map with a live arrival time.
Your job report, same day
See exactly what was done as soon as we finish.
Invoice and receipt in one place
Pay online in seconds, and your receipt is always there when you need it.
Why choose Lighting Electrical
- Reviews
- 61
- Rating
- 4.7
- Trading since
- 2016
“Ten years on Colchester housing stock and I have seen most of it: terraces where the lighting circuit has been extended once too often, boards fitted before RCDs were standard, new builds with sockets nowhere near the kitchen. I check the earthing, the bonding and whether the supply will carry another load before I price anything, because the age of a house settles nothing on its own.”
Valandi Kotorri, Lighting Electrical
Book NowPhotos of our work
What does an EICR check?
The fixed wiring: the consumer unit, the cables, the sockets, the switches and the fixed lighting. Plug in appliances are not part of it, and neither are repairs or a new consumer unit, which are separate jobs.
Does the power stay on during the test?
No. Circuits are isolated one after another while they are tested and powered back up as each finishes, so parts of the property go dark in turn.
What does FI mean on a report?
FI means further investigation is needed, where a reading needs a deeper look before the circuit can be called sound. It does not pass or fail the report on its own, but it does need following up.
Is an EICR a legal requirement for landlords?
Private landlords in England must hold a valid EICR for each rented home, renewed inside five years of the last one or when a new tenancy begins.
Can I use an old EICR for a new tenancy?
Only if it is still current. If the previous report has run out, the property needs testing again and a new certificate issued before the tenancy begins.
