EICR in Wivenhoe

Landlord EICRs in Wivenhoe written so an agent can act on them, with each finding coded and priced rather than left as a note.

Get a quoteSee price

Share the job details and postcode — the price is confirmed before any work.

EICR work by Lighting Electrical

EICR price in Wivenhoe

EICR (electrical safety report)

£150

Fixed price

Full eicr details

EICR in Wivenhoe

Wivenhoe has a lot of let property, and much of it is older houses split into flats where circuits were divided between units at some point and nobody wrote down how.

That is what the report has to resolve. We establish where each installation actually starts and stops, test every circuit within it, and say plainly which door the report covers.

Why choose us

We are NAPIT registered under member number 80815, and NAPIT publish that listing on their own member search, so you can confirm it without asking us for anything. Beyond the registration, the things we hold ourselves to are simple: the fault explained in plain English, a price agreed before the work starts, and the certificate or report the job calls for handed over at the end.

Tell us what you need

Send the job details and you get a straight answer on what is involved and what happens next.

Everything in one place

Your quote, updates, payments and receipts stay together.

Track the job

Photos, access details and updates stay with the job from start to finish.

Know the price

See a price where one is available. Any quoted work is agreed before it starts.

What the inspection covers

The electrician checks and tests the fixed electrical installation, then records the findings.

Included in the inspection

  • Consumer unit, circuit protection and RCDs
  • Fixed wiring and electrical circuits
  • Sockets, switches, lighting and accessible fixed equipment
  • Earthing and bonding arrangements
  • A written report with the inspection results

Not included automatically

  • Portable appliance testing, often called PAT
  • Repair work or replacement parts
  • Further investigation beyond the agreed inspection
  • Areas that cannot be accessed safely

What happens on the day

Knowing what the electrician needs makes the visit easier and reduces avoidable delays.

  1. 01

    Make the electrics accessible

    Provide access to the consumer unit, sockets and other fixed electrical points. Share earlier reports if you have them.

  2. 02

    Allow for brief power interruptions

    Parts of the installation need to be isolated while circuits and protective devices are tested.

  3. 03

    Receive the written report

    The report records the results, any limitations and whether further action is recommended.

Trusted by customers

4.9

Great work in the world thank you

Nicholas
MyJobQuote

I had an EV charger installed by Valand, and I couldn’t be more pleased. From the initial quote to the final inspection, the entire process was smooth and stress-free. He was knowledgeable, friendly, and made sure the charger was positioned exactly where I wanted it. All the necessary certificates provided and warranty as well. Excellent service from start to finish!

egli tollaku
Google

Was with us with in good time, was brilliant at finding the fault and getting us back on with power, highly recommend:)

Tara Elliott
Google

EICR in Wivenhoe — FAQs

Two flats, one house. Do I need two reports?+

One per installation. Where the split is genuine, each flat gets its own. Where circuits still cross between units the report says so, because that is a finding in itself and it usually needs putting right.

The tenants are in. Does that work?+

Yes, with notice. Every room and the meter cupboard have to be reachable and the power goes off in sections, so an agreed time matters more than an empty house.

How fast can I have the report?+

Normally within a couple of days of the visit. If something is dangerous you hear on the day, not when the paperwork lands.

The agent wants remedials quoted separately.+

That is how we do it anyway. Each coded item is priced on its own so the landlord chooses what proceeds, and the report is not a sales document.

How often?+

At least every five years for a private tenancy in England, and again at a change of tenancy where the existing report has run out.

More in Wivenhoe

Start with the job details

Tell us the property, the postcode and what is actually happening, and add a photo of the fuse board if a circuit keeps tripping. That is usually enough for us to say which service it maps to and what the next step is. Homeowners, landlords and businesses are all welcome.