How to tell if a house needs rewiring

Crumbling cable, a fuse board with no RCD, or sockets that overheat are signs a house needs rewiring. Lighting Electrical in Peterborough tests the wiring and writes an EICR naming each failed part.

Calls answered 24/7

  • 10 years trading

Why does a house need rewiring?

A house needs rewiring when the cables, the earthing or the fuse board fail tests and a repair on one circuit will not leave the installation safe.

  • Cable insulation has perishedOld rubber or cloth insulation dries and cracks. Bare copper can then touch another conductor or the metal of a fitting. A repair at one socket leaves the same cable in the walls.
  • The fuse board has no RCDAn RCD is a switch that cuts power when current leaks to earth. A board of wire fuses does not do that. Fuse board replacement can add that protection when the cables still test sound.
  • Circuits have been extended too oftenA lighting circuit tapped for extra fittings overheats in the cable. Extra sockets on spurs do the same on a ring. The test shows whether that circuit can stay or must be replaced.
  • Earthing or bonding is missingEarthing gives fault current a path back so a breaker can open. Bonding links metal pipes to the fuse board. Without both, a new fitting on old cable does not make the installation safe.
  • The supply cannot carry the loadA shower, a cooker or an EV charger needs spare capacity on the supply. We check that capacity before we price the new work. Where the cables are already at their limit, the EICR records that those cables need replacing.

What can you check safely at home?

You can look at the closed fuse board, the fronts of sockets and any cable already in view. You do not open fittings or touch conductors.

  • The fuse board with the cover shutLook through the window or at the front. Wire fuses and no button marked T or test mean there is no RCD. Leave every screw in place.
  • Heat, brown marks or a buzzing socketA warm faceplate, brown stains around the pin holes or a buzz means a joint is arcing. Arcing is a spark at a loose terminal. Stop using that socket and leave the face on.
  • Lights that dip when a kettle boilsA clear dip in the lights when a kettle or a heater starts means the circuit is near its limit. Note which rooms dip. That note helps the test.
  • Cable you can already seeCloth braid or cracked rubber at a pendant, or at a socket front that is already loose, is old insulation. Do not pull it. Do not unscrew the fitting to see more.

When should you book a wiring test?

Book Now if you can see perished cable, the fuse board has no RCD, or a socket is hot or smells of burning.

  • You can see perished cableCloth braid or cracked rubber in view means the insulation has failed at that spot. The test follows that cable through the circuit. Book Now so the circuit can be tested with the power off.
  • A socket is hot or smells of burningHeat, a buzz or a burning smell at a socket or the fuse board means a joint is failing. Use the breaker handle to switch that circuit off. Keep the cover screws in place and Book Now.
  • You are adding a heavy new loadAn electric shower, a cooker or an EV charger draws a large current. We check whether the supply and the cables can carry it before that work is priced. Book Now for the EICR when the board still has wire fuses.
  • A landlord needs a current reportPrivate rented homes in England need a current electrical safety report. The report shows whether the wiring can stay, needs a repair, or needs House Rewiring. Book Now when the last report has ended.

What happens on the wiring inspection?

We test the fixed wiring and write an EICR. A rewire is quoted only after those results, and only if the cables cannot stay.

  • What you have noticedWe ask which sockets run hot, which breakers open, and where old cable is already visible. We look at the fuse board with you. We do not remove a cover until that circuit is switched off and a tester shows it is dead.
  • Tests on each circuitWe switch the installation off in stages and test each circuit. An insulation test looks for current leaking through old cable. A continuity test checks the earth path. An RCD test checks that the safety switch opens.
  • The report and the codesWe complete the EICR and talk through each observation. C1 means danger present and that circuit is made safe before we leave. C2 means the report is unsatisfactory. C3 is an improvement and does not fail the report on its own.
  • A separate price if the cables failIf the cables fail, we write a price for House Rewiring. If the cables pass and the board does not, we write a price for Fuse board replacement. The inspection price does not include that later work.

What does the wiring inspection cost?

The EICR price covers the inspection of the fixed wiring and the written electrical safety report. It does not cover House Rewiring or a new fuse board. More circuits, an outbuilding or a commercial layout take longer and change the price. Any later repair is written as its own price after the report.

From £150

Included in the inspection

  • Visual check of the consumer unit, cabling, sockets, switches and fixed lighting
  • Dead and live tests on the circuits, including earth continuity and insulation resistance
  • Classification of each observation as C1, C2, C3 or FI on the report
  • A written EICR for the property, signed by us
  • A short talk through the findings before we leave

Not included automatically

  • Repair of faults found during the test
  • PAT testing of plug-in appliances
  • A new consumer unit or a rewire

Ways to pay

  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay
  • Klarna
  • Pay by bank
  • Bank transfer
  • A house with more circuits or a detached garage takes longer to test than a small flat with a single board.
  • House Rewiring and Fuse board replacement are priced on their own after the EICR. A Hager, Wylex or Contactum board is quoted only when the report shows the board should be changed.
  • The inspection is carried out under our NAPIT registration, and the EICR is the paperwork you keep.

View the EICR cost guide

How booking works

  1. Tell us about the job

    Tap Book Now and describe the work in the chat. Photos help.

  2. Get your price

    You see your price in the chat. A set price is paid at checkout; any other job is quoted first.

  3. Choose your visit

    Give your address and when you are free, and the visit is arranged.

Why choose Lighting Electrical

We work with Hager, Wylex, Contactum, BG Electrical, MK Electric, Varilight, myenergi, Ohme, Hypervolt, Andersen, Aico, FireAngel and Mira.

Photo of Valandi KotorriValandi KotorriElectrician
Reviews
61
Rating
4.7
Trading since
2016
“Ten years on Colchester housing stock and I have seen most of it: terraces where the lighting circuit has been extended once too often, boards fitted before RCDs were standard, new builds with sockets nowhere near the kitchen. I check the earthing, the bonding and whether the supply will carry another load before I price anything, because the age of a house settles nothing on its own.”

Valandi Kotorri, Lighting Electrical

Book Now

Questions about rewiring a house

Still have a question?

Does an old house always need a full rewire?

No. The age of a house settles nothing on its own. We check the earthing, the bonding and whether the supply will carry another load. The EICR then shows if the cables can stay.

Will a new fuse board avoid a rewire?

Only when the cables pass their tests. A new fuse board adds RCD protection and new breakers. It does not replace cloth or rubber cable that has failed in the walls.

What do C1, C2 and C3 mean for a rewire?

C1 means danger is present and we make that circuit safe before we leave. C2 fails the report. The remedy is a repair of that circuit or House Rewiring, according to the test results. C3 is an improvement and does not fail the report on its own.

How often does a rented house need this report?

Private rented homes in England need a current report, usually every five years, or at a change of tenancy if the last report has ended. We inspect the wiring and issue the EICR for the tenancy file.

Do you rewire on the same visit as the test?

No. The visit is the EICR. We test, explain the codes and leave the report. House Rewiring starts only after you accept a separate written price.

Related problems

Sources

Updated 16 November 2026

Book or ask a question

Calls answered 24/7