Unsatisfactory EICR: what happens next?

An unsatisfactory Electrical Installation Condition Report, an EICR, means remedial work is needed on items marked unsafe or still unconfirmed. Lighting Electrical in Peterborough reads the report and writes a price for the repairs.

Calls answered 24/7

  • 10 years trading

Why is an EICR unsatisfactory?

An EICR is unsatisfactory because it contains a C1, a C2, or further investigation. A C3 recommendation on its own leaves the report satisfactory.

  • A C1 means danger is presentA C1 means danger is present on the named circuit, so that circuit needs remedial work now. If the breaker is already off, it stays off. We test the named circuit before any repair starts.
  • A C2 means it may become dangerousA C2 means the item is potentially dangerous, and that code still fails the report. Sockets with no RCD protection are recorded this way. An RCD is a switch that cuts the power when current leaks to earth.
  • Further investigation is still openFurther investigation means the inspector could not confirm that part was safe. The report shows this as FI. The EICR stays unsatisfactory until that circuit or joint has been tested.
  • The consumer unit lacks modern protectionRewirable fuse wire does not act as an RCD or an RCBO. An RCBO protects one circuit against overload and against a leak to earth. A report that codes this board is priced as fuse board replacement.
  • Earthing or bonding is recorded as failedEarthing is the path that carries fault current back so a protective device can open. Bonding joins metal water and gas pipes to that path. A missing or broken link is coded because a fault may not clear.

What can I check on an unsatisfactory EICR?

You can read the report and look at the outside of the fuse board. Keep every cover on, and keep your hands off cables and gas pipes.

  • The result on the front of the reportThe summary says satisfactory or unsatisfactory. Unsatisfactory means the observations include a C1, a C2 or further investigation. C3 notes with a satisfactory result are not a failed report.
  • What each observation code meansRead the code beside each line. C1 is danger present. C2 is potentially dangerous. C3 is only a recommendation. FI means further investigation and that item still needs a test.
  • The time the report allows for repairsThe observations state the time for the remedial work. For a private rented home in England the limit is 28 days, or fewer days when the report says so. Keep the report so those same lines can be tested.
  • The fuse board with the cover shutLook for fuse wire, brown marks, or a breaker that is already down. Leave the screws in place. Do not reset a circuit the report has given a C1.

When should I book after an unsatisfactory EICR?

Book Now if the report is unsatisfactory, and book first when a C1 is listed. A satisfactory report that only lists C3 items does not need remedial work.

  • The report includes a C1Danger is present on the circuit named in that line. Leave the breaker off when it is already off. Book Now so we can test the failed part and price the repair.
  • A C2 or further investigation is listedEither code keeps the report unsatisfactory. Book Now and have the report with you. We test the named item and write a price before the repair starts.
  • The property is privately rentedIn England the C1, C2 and further investigation items are due within 28 days, or sooner when the report gives fewer days. Book Now with the report. We give you the certificate for the remedial work we finish.

What happens on a visit for an unsatisfactory EICR?

We read your report, test each coded item, and write the remedial price before a repair starts.

  • We match the report to the installationWe go through every C1, C2 and further investigation line with you. Each line is tied to a circuit or to the consumer unit. No cover comes off until that item is the one under test.
  • We test the circuits the report namesWe isolate the circuit named in the observation. Continuity shows whether the copper still joins end to end. Insulation shows whether current can leak between the conductors. The readings separate a cable, a joint, a device and the consumer unit.
  • We check earthing, bonding and the supplyWe check earthing, bonding and spare capacity on the supply before we write a price. Spare capacity means the supply can carry another load. The age of the house does not set the price on its own.
  • The repair and the certificateWork starts after you accept the written price. A failed consumer unit is fuse board replacement, with RCD or RCBO protection and notification through NAPIT. A repair to one existing circuit is recorded on a minor works certificate. A new EICR of the whole installation is its own job.

What does work after an unsatisfactory EICR cost?

The price covers the time to read the unsatisfactory EICR, test each C1, C2 and further investigation item, and tell you what failed. Any repair starts only after you accept a written price. A longer test, a part, a consumer unit, or the certificate for that work changes the price.

From £450

Included when agreed

  • Isolation of the incoming supply and removal of the existing fuse board
  • Supply and fitting of a new consumer unit with RCD or RCBO protection to suit the circuits
  • Reconnection of existing circuits and labelling of each way
  • Dead and live tests on the circuits that feed from the new board
  • An electrical certificate and notification through NAPIT where the work requires it

Not included automatically

  • Rewiring damaged cables found in walls, lofts or under floors
  • New sockets, lights, showers or chargers that need extra circuits
  • Making good plaster, paint or kitchen units around the cupboard

Ways to pay

  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay
  • Klarna
  • Pay by bank
  • Bank transfer
  • A C3 item stays off the remedial price unless you ask for that improvement.
  • Fuse board replacement has its own written price when the consumer unit is the failed part.
  • We fit a Hager, Wylex, Contactum, BG Electrical or MK Electric unit only when the remedial work needs that new board or device.

View the fuse board replacement cost guide

How booking works

  1. Tell us about the job

    Tap Book Now and describe the work in the chat. Photos help.

  2. Get your price

    You see your price in the chat. A set price is paid at checkout; any other job is quoted first.

  3. Choose your visit

    Give your address and when you are free, and the visit is arranged.

Why choose Lighting Electrical

We work with Hager, Wylex, Contactum, BG Electrical, MK Electric, Varilight, myenergi, Ohme, Hypervolt, Andersen, Aico, FireAngel and Mira.

Photo of Valandi KotorriValandi KotorriElectrician
Reviews
61
Rating
4.7
Trading since
2016
“Ten years on Colchester housing stock and I have seen most of it: terraces where the lighting circuit has been extended once too often, boards fitted before RCDs were standard, new builds with sockets nowhere near the kitchen. I check the earthing, the bonding and whether the supply will carry another load before I price anything, because the age of a house settles nothing on its own.”

Valandi Kotorri, Lighting Electrical

Book Now

Questions about an unsatisfactory EICR

Still have a question?

Does a C3 make my EICR unsatisfactory?

No. A C3 is a recommendation for improvement, and it does not fail the report. The report is unsatisfactory when a C1, a C2 or further investigation is present. We price a C3 item on its own if you want that work done.

Will you replace the fuse board?

We replace it when the observations show the consumer unit has failed or lacks the RCD or RCBO protection the circuits need. A board that tests sound stays in place. Fuse board replacement then has its own written price, and the certificate is notified through NAPIT.

Do I get a new EICR after the repairs?

A minor works certificate records a repair to one existing circuit, and a new consumer unit gets an electrical installation certificate. A full EICR is a separate inspection of the whole installation. We do that inspection as its own job.

What should a landlord pass to the tenant?

Give the tenant the unsatisfactory EICR, then written confirmation after the C1, C2 and further investigation items are finished. In England that work is due within 28 days, unless the report gives fewer days. We provide the certificate for the remedial work we complete.

Does the whole house need to be off?

No. We isolate the circuit named in the observation we are testing. Circuits the report leaves in service stay on. A C1 circuit stays off until the failed part is repaired and that circuit is tested again.